
01Bathrooms
Full remodels and partial ones.
Demo to finish: waterproofing, tile, fixtures set, trim, paint. Or just the shower, or just the floor. We work with your designer’s drawings or help you make the decisions if you don’t have one.
Tile and stone is where North Point started. Full bathroom remodels, showers, floors, and backsplashes, plus the drywall, trim, and paint that finish the room — for homeowners and for the interior designers who subcontract us.
2–4weeks
for a full bathroom, depending on tile scope and fixture lead times. The schedule is in writing before demo starts.
Where we started
Tile and stone: large-format tile, mosaics, niches, benches and curbless showers.
Designers welcome
Designers subcontract their bathroom and tile builds to us and stay involved on selections; we build to their drawings.
What we do
Bathrooms, tile and floors, and the drywall, trim and paint that finish the room.



01/ 04Double vanity in oak
01Bathrooms
Demo to finish: waterproofing, tile, fixtures set, trim, paint. Or just the shower, or just the floor. We work with your designer’s drawings or help you make the decisions if you don’t have one.

02Tile & stone
Porcelain, ceramic, and natural stone on floors, showers, and backsplashes. Large-format tile, mosaics, niches, benches, curbless showers. Interior designers use us for their builds because the layouts come out the way the drawing shows.

03Flooring
LVP and vinyl for kitchens, basements, and mudrooms that see snow and salt; porcelain where you want it to last decades. Subfloor prep included, because a floor is only as flat as what it sits on.

04Finishing
Bedrooms, basements, and storage rooms turned into living space. Drywall hung and finished, trim run, painted, and floored — often after we’ve already done the roof or siding on the same house.
Step 02 of every job
What gets replaced and what doesn’t, in writing, before a number. Every scope is written for one house. Here’s what a bathroom remodel looks like.
On the roof or in the room, photographing what he finds.
What gets replaced and what doesn’t, before a price.
Dates are kept. Customers mention it more than anything.
The people who quoted it do it. One crew, roof to drywall.
Cleaned, walked with you, punch list fixed before the invoice.
Recent work
Showers, vanities, tubs and floors, from mid-remodel to the final walk.









Reviews
From 47 five-star reviews on Google. Every one names the same person: on the roof, on the phone, and at the final walk.
Read them on GoogleIncredibly talented and detail oriented. We remodeled two bathrooms with Davis Interiors, who used North Point for all of the work. Stress free.
Questions
Call or text. Aleksei answers the phone.
(612) 290-1415Yes. Designers subcontract their bathroom and tile builds to us and stay involved on selections; we build to their drawings. Property managers and small commercial clients too.
A full bathroom typically runs two to four weeks depending on tile scope and fixture lead times. You’ll have the schedule in writing before demo starts.
Yes. Shower tile, floor tile, or a backsplash on their own are common jobs for us.
Yes — framing, drywall, trim, paint, and flooring for bedrooms, family rooms, and storage rooms, including egress and moisture considerations for below-grade rooms.